Edwards, D, Parn, E A, Sing, M C and Thwala, W D (2019) Risk of excavators overturning. Engineering, Construction and Architectural Management, 26(03), 479–98.

Ekanayake, E, Shen, G and Kumaraswamy, M M (2019) Mapping the knowledge domains of value management: a bibliometric approach. Engineering, Construction and Architectural Management, 26(03), 499–514.

Gan, X, Chang, R, Langston, C and Wen, T (2019) Exploring the interactions among factors impeding the diffusion of prefabricated building technologies. Engineering, Construction and Architectural Management, 26(03), 535–53.

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects. Engineering, Construction and Architectural Management, 26(03), 386–407.

Juan, Y, Lin, I and Tsai, J (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(03), 515–34.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(03), 462–78.

Ning, Y, Feng, M, Feng, J and Liu, X (2019) Understanding clients’ experience of trust and distrust in dwelling fit-out projects. Engineering, Construction and Architectural Management, 26(03), 444–61.

Wanigarathna, N, Sherratt, F, Price, A and Austin, S (2019) Design re-use: critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(03), 350–66.

Wu, G, Zhao, X, Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(03), 408–23.

Zhang, L, Fenn, P and Fu, Y (2019) To insist or to concede? Contractors’ behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(03), 424–43.

Zhang, R, Xing, J, Ye, K, Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(03), 367–85.

Zhou, Y, Yang, Y and Yang, J (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(03), 554–74.

  • Type: Journal Article
  • Keywords: China; Barriers; Strategies; Comparative analysis; Building information modelling;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-04-2018-0158
  • Abstract:
    Effective BIM application hinges on the development of appropriate strategies for its implementation. Though some strategies have been deployed to facilitate BIM implementation in China, their outcomes are not clear. The purpose of this paper is to provide recommendations regarding appropriate strategies for promoting the development and implementation of BIM in China based on lessons learned from advanced implementation experiences in other countries. Design/methodology/approach First, existing strategies are investigated and barriers to BIM implementation mentioned in previous studies are summarized. Then, the identified barriers are mapped to the strategy contents. Finally, a comparative analysis on different areas is conducted to propose suggestions for identified items of BIM implementation strategies that need to be improved. Findings Six unaddressed barriers to BIM implementation strategies in China were identified from the mapping results: insufficient government lead/direction, organizational issues, legal issues, high cost of application, resistance to change of thinking mode and insufficient external motivation. Originality/value The findings of this study can be used to facilitate the development of appropriate strategies within the public and private sectors for promoting BIM implementation in China and elsewhere.